Schedule
Schedule
Overview
This is a resource booking and scheduling system designed for managing shared equipment and facilities across multiple locations (Textile Shop and Wood Shop).
Main Components
1. Schedule View (Day View)
Navigation Controls
| Control | Description |
|---|---|
| Choose Resources | Opens resource selection dialog to choose which resources display in the schedule |
| Today | Jumps to current date |
| Arrow buttons (< >) | Navigate backward/forward between dates |
| View toggles | Switch between day, week, month, and year views |
| Date display | Shows currently selected date (e.g., November 26, 2025) |
Time Grid Features
- Time slots: Hourly intervals from 1am to 11pm
- Current time indicator: Red vertical line showing present time
- Resource list: Left column with collapsible categories
- Visual booking: Click-and-drag to create reservations
Available Resources (Example)
| Category | Resource | Type |
|---|---|---|
| Textile Shop | Embroidery Machine | Equipment |
| Textile Shop | Vinyl Cutter | Equipment |
| Wood Shop | Drill Press | Equipment |
| Wood Shop | Lathe | Equipment |
Resource Organization
Resources are organized hierarchically by location/shop. Click the collapse icon (โฝ) to hide or show resource categories.
2. Resource Details View
Status Indicators
| Status | Badge Color | Meaning |
|---|---|---|
| Available | Green | Resource is currently available for booking |
| In Use | Red | Resource is currently reserved |
| Maintenance | Yellow | Resource is under maintenance |
Calendar Integration
- Week view display (e.g., Nov 23-29, 2025)
- View options: month | week | day | list
- Holiday calendar integration (Alberta Holidays)
- Current day highlighted in yellow
- Time slots: 7:00 am through 9:00 pm
Holiday Awareness
The system automatically integrates regional holidays (Alberta Holidays shown in example). Booking restrictions may apply during holiday periods.
3. Access Rules Configuration
Click the ACCESS RULES button to open the configuration panel.
Rule Categories
| Tab | Purpose | Applied When |
|---|---|---|
| ACTIVATION | Controls when resource can be activated/used | Resource startup |
| BOOKING | Controls booking permissions and restrictions | Reservation is created |
| CANCELLATION | Governs cancellation policies | Reservation is cancelled |
Rule Configuration Icons
| Color | Meaning |
|---|---|
| Blue | Configuration/settings available |
| Yellow | Timing-related rule |
| Gray | Schedule-related rule |
Rule Application
"Booking rules are applied when a reservation is 'created'"
Rules are evaluated in real-time when users attempt to create bookings. Failed rule checks will prevent reservation creation with an explanatory message.
4. Resource Configuration
Training Requirements
| Resource | Training Required | Status |
|---|---|---|
| Embroidery Machine | No | โ Configured |
| Vinyl Cutter | Yes | Training module required |
| Drill Press | Yes | Safety certification needed |
| Lathe | Yes | Advanced certification needed |
Training Status
Green checkmark (โ) indicates the training configuration is complete. Resources requiring no training are explicitly marked for clarity.
Team Management
Features:
- MESSAGE button: Direct communication with assigned team members
- Team roster: View all members with resource access
- Avatar display: Visual identification of team members
Example Team Member:
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ [MESSAGE] โ
โ โ
โ โญโโโโฎ โ
โ โ K โ โ
โ โฐโโโโฏ โ
โ Khushi Rakeshkumar Jariwala โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโEquipment Configurations
Spool Type Configuration (Embroidery Machine):
| Parameter | Value |
|---|---|
| Name | Spool Type |
| Description | Thread colors for each 3 spool |
| Duration | 24 hours |
| Available Options | RGB, White, Black |
Configuration Duration
Configuration changes take 24 hours to apply. Plan accordingly when switching spool types.
Infrastructure Dependencies
| Component | Status | Requirement Level | Description |
|---|---|---|---|
| Power | โ Operational | Required | Electrical power must be available |
| Network | โ Operational | Optional | Internet connectivity for updates |
| HVAC | โ Operational | Required | Climate control for equipment |
Critical Infrastructure
Components marked as "Required" (shown with red/pink badge) must be operational for the resource to be bookable. If infrastructure fails, all active bookings may be automatically cancelled.
5. Daily Usage Trend Analytics
Heatmap Legend
| Color | Usage Level | Description |
|---|---|---|
| Light gray | None/Minimal | 0-10% utilization |
| Light blue | Low | 11-35% utilization |
| Medium blue | Moderate | 36-65% utilization |
| Dark blue | High | 66-100% utilization |
Calendar Layout
Rows:
- M: Monday bookings
- W: Wednesday bookings
- F: Friday bookings
Use Cases:
- Identify peak usage periods
- Plan maintenance during low-usage times
- Optimize resource allocation
- Forecast capacity needs
Analytics Insight
The heatmap shows most activity concentrated in October-November. This may indicate seasonal patterns or project cycles.
User Workflows
Viewing the Schedule
- Navigate to the Schedule page
- Click Choose Resources to select specific equipment
- Use date navigation:
- Click Today for current date
- Use < > arrows to move forward/backward
- Switch views using day | week | month | year toggles
Checking Resource Availability
| Step | Action | Result |
|---|---|---|
| 1 | Click on specific resource name | Opens resource details panel |
| 2 | Review calendar view | Shows open time slots in white |
| 3 | Check status badge | Confirms current availability |
| 4 | Note any infrastructure alerts | Identifies potential booking blocks |
Creating a Booking
- Select desired time slot on calendar
- Click and drag to define duration
- System validates against access rules
- Confirm booking details
- Receive confirmation notification
Rule Validation
Your booking will be checked against all active booking rules. Ensure you meet training requirements and infrastructure is operational before attempting to book.
Configuring Booking Rules
Detailed Steps:
- Open resource details page
- Click ACCESS RULES button (top right)
- Navigate to BOOKING tab
- Review list of active rules
- Click ๐ง (blue wrench icon) to modify rule
- Adjust parameters as needed
- Save changes (applies to future bookings)
Monitoring Infrastructure
Quick Check:
| Status | Action Required |
|---|---|
| โ Green checkmark | None - infrastructure operational |
| โ ๏ธ Yellow warning | Monitor - potential issues |
| โ Red X | Immediate attention - resource unavailable |
Detailed Steps:
- Scroll to Infrastructure section in resource details
- Verify green checkmark (โ) on all required components
- Note any "Required" badges (critical dependencies)
- Click โ (info icon) for component details
- Set up alerts for infrastructure failures (if available)
Best Practices
| Practice | Benefit | Priority |
|---|---|---|
| Check infrastructure before booking | Avoid cancelled reservations | High |
| Review access rules regularly | Understand restrictions | Medium |
| Monitor usage trends | Find optimal booking times | Medium |
| Maintain training certification | Ensure continuous access | High |
| Respect holiday schedules | Comply with organizational policies | High |
Quick Reference
Keyboard Shortcuts
| Shortcut | Action |
|---|---|
T | Jump to Today |
โ / โ | Previous/Next day |
D | Day view |
W | Week view |
M | Month view |
Y | Year view |
Pro Tip
Hold Shift while using arrow keys to jump by week instead of day.
Common Issues & Solutions
| Issue | Possible Cause | Solution |
|---|---|---|
| Cannot create booking | Training not valid | Complete required training certification |
| Booking immediately cancelled | Infrastructure failure | Wait for power/network restoration |
| Resource not visible | Not in selected resources | Click "Choose Resources" and select it |
| Booking exceeds duration | Max duration rule active | Split into multiple shorter bookings |
| Cannot book past hours | Business hours rule | Book during allowed time window |